The cost of installing LED stadium light is mainly composed of site construction, poles, LED stadium light, labor costs, we mainly analyze the cost of poles and lights today.
What are the rating requirements for stadium light?
The level of lighting requirements for stadiums varies depending on the purpose (e.g. amateur training, amateur games, professional games, international events). Normally, stadium lighting standards follow the recommendations of international or regional lighting associations (e.g. CIE or FIFA). Lighting ratings are based on factors such as horizontal illuminance, vertical illuminance, uniformity, anti-glare and color temperature. The following are typical stadium lighting levels:
| Lighting Class | Application | Average Horizontal Illuminance (E_avg) | Vertical Illuminance | Uniformity (U1h) | Glare Control Requirements | Color Temperature (K) | CRI |
| Class III | Community activities, recreational games, amateur training | 100-200 lux | Not strictly required | ≥ 0.5 | Low, avoid direct glare on players and spectators | Not strictly required | |
| Class II | Amateur games, club matches, regional matches | 200-500 lux | 150-300 lux | ≥ 0.6 | Glare control needed | Not strictly required | |
| Class I | Professional matches, national leagues, professional clubs | 500-750 lux | 300-500 lux | ≥ 0.7 | Higher requirements for viewing experience | 4000K-6000K | >70 |
| Class IA/I+ | International matches, national leagues, HD TV broadcasts | 1000-2000 lux | 800-1000 lux | ≥ 0.8 | Strict requirements, avoid interference with cameras | 4000K-6000K | >80 |
| Class IAA | World-class events (e.g., World Cup, Olympics), 4K/8K TV broadcasts | 2000-2500 lux | Above 1000 lux | ≥ 0.8 | Very strict, avoid glare interference | 5000K-6200K | >80 |
Let’s take a few examples of different levels of requirements and budget for the costs involved.
Cost of Grade 3 -standard training
FIFA Lighting standards for training pitches
| Illuminance requirements | Grade 3 | Grade 2 | Grade 1 |
| Standard training | Match practice | FIFA World Cup training | |
| Eh ave | Average > 300 lux | Average > 500 lux | Average > 750 lux |
| (average horizontal illuminance) | |||
| Uniformity U1h | > 0.40 | > 0.40 | > 0.40 |
| Colour temperature (Tc) | 4,200–6,200K | 5,000–6,200K | 5,000–6,200K |
| Colour rendering (Ra) | ≥ 70Ra | ≥ 70Ra | ≥ 80Ra |
Cost of Grade 3 -standard training
Let’s analyze the cost of poles and LED stadium lights as an example of a Grade 3 requirement.Grade 3 There are two kinds of light pole distribution scheme, the first is 4 light poles, the second is 8 light poles, considering the convenience and economy we choose 4 light poles of the program
Four poles
22-25 meters each poles
Eight poles
16-18 meters each poles
We recommend LED stadium light
According to Dialux software simulation, we can choose 28 pcs 1200W LED high mast Lights, 20 pcs 30 degree angle, 8 pcs 60 degree angle, 7 pcs LED high mast Lights installed on each pole, the LED lights are divided into two layers, the top 3 pcs installed below 4 pcs, each LED high mast lights installation angle needs to be out of a detailed report to guide the installation of Lights.
From the above effect can be seen, the World Cup or FIFA competition for the LED stadium Lights can provide the illumination requirements are very high, they are very important for the protection of players or to improve the audience to watch the game of the degree of comfort, the reality of many of our stadiums are less than 100Lux of illumination, so if you need to build a stadium that meets the standard must look for a professional design and construction team. We are happy to work with professional teams to solve lighting problems, and we would be honored to hear from you.
How much does a stadium light system that meets FIFA Grade 3 -standard training really cost?
| Items | Parameters | Usage | Price | Total price per item | Total Cost |
| LED Stadium Light | 1200W | 28 | 500 | 14000 | |
| Light Pole | 22M | 4 | 5800 | 23200 | 37200 |
The above price is for reference, and is quoted in US dollars.
This item can be loaded in one container, the sea transportation time is usually expected to be 30-40 days, the best practice is to transport in advance, can be placed on the construction site first, when the foundation is ready to directly install.
You can learn more about LED stadium lights by clicking here
